OTHER SERVICES

Interior & Construction Support in Pattaya

Shop fit-outs and home renovations, with us as your link to local contractors.

AT A GLANCE

Scope of work
Interior and construction work for shops and homes
Our role
Liaising with local contractors and checking progress
Pricing
Quoted per project (please enquire)
Languages
Japanese and English

Information as of 25 Sept 2026

Who this service is for

  • You are opening a restaurant, salon or other shop in Pattaya and planning the fit-out
  • You have bought a condo and want to renovate it to suit you
  • You want a contractor's quote explained to you in Japanese
  • You want photo updates on progress while you are in Japan

Quotes and schedules in Thailand are not always laid out the way you may expect. We sit between you and the local contractor, pass on your requirements accurately, and explain quotes and progress in Japanese. The works themselves are carried out by the contractor you sign with, who is responsible for them.

How a project runs

  1. The brief. We ask about use, floor area, budget range, deadlines such as an opening or move-in date, and any photos or references
  2. Building conditions. In condos and commercial buildings we first check the office's rules on approval, working hours and access for materials
  3. Comparing quotes. We obtain quotes from several local contractors and set out items, materials and timescales side by side
  4. Contract. Scope, material codes, schedule, payment stages and how defects are handled are put in writing
  5. Works. We check progress on site and send photos. Any change is agreed only after its effect on cost and time is clear
  6. Handover inspection. We inspect the finished work with you, list any snags and pass them to the contractor
  7. After handover. We confirm who to contact about defects and how long the contractor will put them right

Timescales and costs

Type of workGeneral guide to durationCost
Repainting, new lighting or curtainsA few days to a weekDepends on the contractor's quote
Partial kitchen or bathroom renovationTwo to four weeksDepends on the contractor's quote
Renovating a whole unitOne to three monthsDepends on the contractor's quote
Shop fit-out, such as a restaurantVaries widely with scope and licensing stepsDepends on the contractor's quote

Duration depends on the scope, the building's working hours, material lead times and rainy-season weather. Our fee as go-between is quoted according to the size of the project and how long we are involved (please enquire).

Some types of shop are inspected for their operating licence once the fit-out is complete. Telling the contractor at the design stage about the facilities that will be checked, such as kitchen layout and drainage, avoids rework.

What to look for when comparing quotes

Local quotes sometimes give only a total, or list items in Thai only. Before comparing prices, it matters that each quote covers the same work. We check the points below and give you a summary in Japanese.

  • Scope. Whether demolition, preparation, finishing, electrics and plumbing, cleaning and waste removal are included
  • Materials. Whether brand, product code and grade are stated, or only "equivalent"
  • Quantities and unit prices. Whether area or count and unit price are shown separately, which helps if extras arise
  • Schedule. Whether the number of days allows for the building's permitted working hours
  • Payment terms. How many instalments and which stage triggers each one
  • Defects. How long after handover the contractor will fix problems free of charge

A lower quote may reflect cheaper materials or less work included. Comparing like with like makes the decision easier.

Building approval and working hours

Works in a condo or commercial building normally begin only after approval from the building's juristic person (management office).

  • Application. Submit the scope, drawings and contractor details for approval
  • Works deposit. A refundable deposit may be required against damage to common areas. The amount varies by building
  • Working hours. Many buildings allow noisy work only on weekday daytimes, not at weekends or on public holidays
  • Access and waste. Agree the delivery entrance, lift use, and where waste is kept and how it is removed
  • Worker access. Some buildings ask for a list of workers or passes

Structural work, extensions or alterations may need a permit from the local authority, such as Pattaya City, under the Building Control Act. We check with the contractor or designer whether this applies.

What we do and do not do

What we do

  • Organise your requirements and pass them on, bridging Japanese, English and Thai
  • Help find contractors and explain the items in each quote
  • Attend meetings and site checks, and report with photos
  • Check the steps for building approval
  • List snags at handover and pass them to the contractor

What we do not do

  • Design or build. Quality, safety and schedule are the responsibility of the contractor you sign with
  • The work of architects or lawyers, such as legal checks on drawings or legal advice on contracts
  • Promise the finish or completion date on the contractor's behalf

Choosing and contracting the builder is ultimately your decision.

Common pitfalls

  • Starting on a verbal quote. Ask for a written quote showing items, quantities, materials and schedule
  • Paying too much up front. Payments are usually split by stage, such as start, midway and completion
  • Leaving materials and colours open. Confirm with samples or photos before anything is ordered
  • Asking for extras verbally. Agree changes only after cost and time are confirmed in writing
  • Forgetting the rainy season. Exterior work and painting are prone to delay from around May to October
  • Starting before building approval. Work can be stopped and the deposit may be disputed

HOW IT WORKS

How it works

01

Share your plans

Tell us the scope, location, budget range and rough timing via the form.

02

Contractors and quotes

We sit in on contractor meetings and explain the scope and quotes clearly.

03

Work begins

We check progress on site and keep you informed as the work moves ahead.

FAQ

Questions about this service

Q01

Can I commission work without speaking Thai?

Yes. Our staff sit in on contractor meetings and explain the scope and quotes clearly, bridging the language gap throughout.

Q02

Can I consult you about a small renovation?

Yes, for shops and homes alike, whatever the scale. Tell us the scope, location and rough timing and we will take it from there.

Q03

Will you check on progress once work begins?

Yes. Once work begins, we check progress on site and keep you informed. Concerns can be raised with us at any point.

Q04

Can the work go ahead while I am in Japan?

Meetings can be held online, and we report site progress with photos and video. The contract and any major changes go ahead only with your approval.

Q05

Can you join meetings with a contractor I found myself?

Yes. We can attend, pass on your requirements and explain the quote and schedule.

Q06

What happens if defects appear after completion?

Defects are put right by the contractor you signed with. We help contact them and explain the problem. Agreeing a defects period in the contract makes this much easier.

Q07

Can I also ask about my shop's operating licence?

Licences and where to apply are covered by our business consulting service. If you want to plan the fit-out and licensing together, you can discuss both with us at once.

READY TO BOOK

Interiors & Construction

Ask us about anything you read above. Book through the form, or message us on LINE for quick questions.

Enquire about this service